MC30 Cutback Bitumen

416 ± 3$

New Steel drum

MOQ

100 MT

Packing

Reconditioned Drum

Payment Term

TT Method
Essential Details Description
Type Cut Back Bitumen
Feed Stock Penetration Bitumen and Petroleum Solvent
HS Code 27150090
Inspection Included
Delivery Term FOB-CFR-CIF
Production and Loading Period Approximately 1 Month
Payment Term TT Method FOB Delivery: 30% advance and balance against customs documents CFR/CIF Delivery: 30% advance and balance against B/L draft
Marking Marking can be customized based on customer request
Supply Capacity 1000 MT/Month
Packing Reconditioned Steel Drum

MC30 Cutback Bitumen Specification

PropertiesSpecification LimitTest Method
MinMax
Kinematic Viscosity at 60 °C ,cSt3060ASTM D2170
Flash Point (Top Open Cup), °C38ASTM D3143
Distillate, %Volume of Total Distillate to @360 °C
To 225 °C35ASTM D402
To 260 °C4070
To 316 °C7593
Residue From Distillation to 360 °C (% Vol by Difference)50
Test on Residue From Distillation Test
Penetration, 25 °C, (dmm)120300ASTM D5
Ductility, 25 °C, (cm)100ASTM D113
Water Content (% Vol)0.2ASTM D95

MC30 Cutback Bitumen Packing

Type Description
Reconditioned Drum Net Weight: 180 kg Gross Weight: 203 kg Empty Drum Weight: 23 kg Number of Drums per Container: 80 Drums in 20-foot Container

Contact us now

Need Help?

Feel free to ask us anything you’re curious about!

Enquiry Form