MC250 Cutback Bitumen

416 ± 3$

New Steel drum

MOQ

100 MT

Packing

Reconditioned Drum

Payment Term

TT Method
Essential Details Description
Type Cut Back Bitumen
Other Name MC 250 Prime Coat, MC 250 Asphalt
Feed Stock Penetration Bitumen and Petroleum Solvent
HS Code 27150090
Inspection Included
Delivery Term FOB-CFR-CIF
Production and Loading Period Approximately 1 Month
Payment Term TT Method FOB Delivery: 30% advance and balance against customs documents CFR/CIF Delivery: 30% advance and balance against B/L draft
Marking Marking can be customized based on customer request
Supply Capacity 1000 MT/Month
Packing Reconditioned Steel Drum

MC250 Cutback Bitumen Specification

Properties Specification Limit Test Method
Min Max
Kinematic viscosity at 60°c ,cST 250 500 ASTM D2170
Flash point(tag open cup), °C 66 ASTM D3143
Distillation test Distillate, volume per cent of total Distillate to 680°F (360°C)
Residue from distillation to 437°F (225°C) 20 ASTM D402
to 500°F (260°C) 5 55
to 600°F (316°C) 60 90
to 680°F (360°C), per cent volume by difference 67
Test on residue from distillation test
Viscosity at 140°F (60°C) 30 120 ASTM D2170
Penetration 77°F (25°C) 100g, 5s mm 120 300 ASTM D5
Ductility 77°F (25°C) 5cm/min cm 100 ASTM D113
Solubility in trichloroethylene % 99 ASTM D2042
Water, percent volume 0.2 ASTM D95

MC250 Cutback Bitumen Packing

Type Description
Reconditioned Drum Net Weight: 180 kg
Gross Weight: 203 kg
Empty Drum Weight: 23 kg
Number of Drums per Container: 80 Drums in 20-foot Container

Contact us now

Need Help?

Feel free to ask us anything you’re curious about!

Enquiry Form