Bitumen Penetration 80/100

416 ± 3$

New Steel drum

MOQ

200 MT

Packing

New Steel Drum, Jumbo Bag

Payment Term

TT Method
Essential Details Description
Type Penetration Grade Bitumen
Feed Stock Iran Crude Oil
HS Code 27132000
Inspection Included
Delivery Term FOB-CFR-CIF
Production and Loading Period Maximum 3 Weeks
Payment Term TT Method FOB Delivery: 30% advance and balance against customs documents CFR/CIF Delivery: 30% advance and balance against B/L daft
Marking Marking can be customized based on customer request
Supply Capacity 50,000 MT/Month
Packing -New Steel Drum -Jumbo Bag

Bitumen 80/100 Specification

Specification Test Method Unit Min. Max.
Specific Gravity at 25 °C ASTM D70 1.01 1.06
Penetration at 25 °C, 100g, 5s ASTM D5 0.1mm 80 100
Softening Point ASTM D36 °C 42
Ductility at 25 °C ASTM D113 cm 100
Loss on Heating ASTM D6 %wt 0.5
Flash Point ASTM D92 °C 230
Solubility in Trichloroethylene ASTM D2042 %wt 99
Spot Test AASHTO T102 Negative

Bitumen 80/100 Packing

TypeDescription
New Steel Drum

Different types of new steel drums are available:

Long Drum -180 kg – Height 980 mm
Short Drum -150 kg – Height 860 mm
Short Drum – Big Lead – 156 kg – Height 890 mm


The diameter of all drums are 500 mm and
the body thickness is 6 mm.

Jumbo Bag

Three types of jumbo bags are available:

Jumbo bag 1 MT in a steel cage on a wooden pallet, with dimensions of 100*105*105 cm.
Jumbo bag 300 kg, with dimensions of 100*55*55 cm
Jumbo bag 1.3 MT, with dimensions of 140*101*101 cm

Contact us now

Need Help?

Feel free to ask us anything you’re curious about!

Enquiry Form